From inquiry and sampling to inspection, export documentation and shipment coordination, our team supports the full project cycle.
We provide full-set inspection and customs documents, arrange production and sea shipment, and offer installation technical support, helping overseas projects clear customs smoothly and arrive on site on schedule.
Provide the destination, required delivery date, product schedule and current drawing revision. Identify the connection standard and any inspection or documentation requirements from the receiving plant.
Separate plate, pipe and fitting quantities clearly. Agree which items must be checked together so that a mismatch at a flange, bend or transition is found before shipment.
Agree the dimensional checks, appearance checks and any specified material tests before order confirmation. Keep inspection records traceable to the approved supply schedule.
Cast basalt components require protection against shock during handling and transport. Confirm item identification and packing requirements for the shipment and the site unloading arrangement.
Coordinate the commercial and customs documents against the actual order. On arrival, check packaging, quantities and visible damage before installation. Record any discrepancy with photographs and item numbers so that it can be reviewed promptly.
Installation support is based on the approved drawings and agreed scope. Pressure testing, commissioning and operating acceptance remain subject to the complete equipment design and the site procedures.