EN
A regional data center operator wanted to reduce cooling power without replacing the entire CRAC infrastructure.
We supplied EC axial fans with PWM speed control, allowing the facility to modulate airflow based on real-time rack temperatures.
Energy monitoring showed a 45% reduction in fan-related consumption, with payback achieved within 14 months.